Service 11

Site lighting trenching and pole base augering in Arizona

A lighting or camera job needs two things from the ground: a trench for the conduit and a hole for every pole base. We handle both, planned together as one mobilization.

In short

Site lighting trenching and augering is the underground work behind a lighting or camera system: trenches for the conduit that feeds each pole, and augered holes for the pole bases. Premier Underground combines the trench and the augering across Arizona, so one contractor handles both steps on one schedule.

01 — What it is

What is site lighting trenching and augering, and when do you need it?

You need it any time poles go up on a site: parking lot lights, walkway and perimeter lighting, or camera poles. Each pole stands on a base in the ground, and each base needs conduit run to it. That makes two kinds of digging on the same layout. A trench is long and narrow. An augered hole is round and vertical, drilled with a rotating auger.

Combining your trench and augering are vital steps to complete the project. We understand these steps and handle them for you.

02 — Scope

What is included

The trench and the holes are the core. The rest is what a real site puts in the way of them.

Part of the jobWhat we do
Conduit trenchTrenching for site lighting, electrical and communication runs. We have the equipment and experience to provide any size trench.
Pole base holesAugering at each pole location, to the diameter and depth on your pole base detail.
Paved surfacesSaw-cutting where the trench crosses asphalt or concrete, with removal and haul-off.
Old bases and obstructionsBreaking out existing pole bases, sidewalks and footers that are in the path.
Congested or unknown groundPotholing with vacuum excavation before the trencher or the auger goes in.
Finished surfaceCoordinated restoration of sidewalk, curb and asphalt once the conduit is in.

03 — Method

How we run a lighting or camera job

Both are planned together from the estimate on.

  1. Preconstruction

    Price both as one scope

    Estimators take the trench footage and the pole count from the same plan. At hand-off, your requests, schedule and needs go to the project manager.

  2. Operations

    Schedule the equipment together

    Project managers schedule equipment through our resource planning, so the trenching and augering equipment are planned for the same visit.

  3. Field

    Lay out and check the ground

    Pole locations and conduit routes are marked from the plans. Where the ground is congested or unknown, we pothole first.

  4. Field

    Trench and auger

    The crew opens the trench and augers the base holes. Field leadership records daily trench inspections and job safety analyses digitally.

  5. Field

    Backfill and clean up

    Trenches are backfilled, surplus spoils are hauled off and surface restoration is coordinated where the route crossed pavement.

  6. Quality

    Walk it and close out

    Quality control and operations do a final walkthrough before close-out.

04 — Safety and quality

A small job gets the same rules

Lighting and camera work is often a short job on a site that is already open to the public. Whether it is a one-day service project or a data center, our focus on safety does not differ. Our approach is four words: train. equip. monitor. train again.

05 — Questions

Site lighting and augering questions

What is augering on a site lighting job?

Augering is drilling a round, vertical hole in the ground with a rotating auger. On a site lighting or camera job, the holes are where the pole bases go. The trench carries the conduit from the power source to each base.

Why combine the trenching and the augering?

The trench and the pole base holes follow the same layout and depend on each other. When one contractor handles both, the conduit route and the base locations are laid out together, the equipment is planned as one mobilization, and you have one schedule to manage instead of two.

Do you trench and auger for security camera poles too?

Yes. We combine trenching and augering for camera installations the same way we do for site lighting: a trench for the conduit and augered holes for the pole bases.

What if old pole bases or pavement are in the way?

We break out and remove existing pole bases, sidewalks and footers, and saw-cut asphalt or concrete where the trench crosses pavement. The debris is hauled off, and surface restoration is coordinated once the conduit is in.

Your job. Your way.

Lighting or camera poles on your plans?

Send us the site lighting or camera layout with the pole locations and conduit routes. We will price the trench and the augering together, so both show up as one scope on one schedule.