How we work

From estimate to close-out, in six phases.

Hiring an underground contractor should not mean learning its org chart. This page walks through what happens on your job, in order, and who at Premier is responsible at each point.

A solution-based company

One process, written down and followed.

In short

Preconstruction prices your scope and hands it to operations in a contract that carries your requests, schedule and needs. Operations builds it with daily planning and digital field records. Quality control visits and walks the finished work. Compliance, finance and logistics keep the paperwork, the payments and the equipment moving behind it.

Our strategy has four words, and you will see them attached to the phases below. They are painted on our trucks for a reason.

Empower
Promote the self-actualization and influence of everyone we work with.
Engage
Include everyone we work with in solutions that succeed.
Optimize
Make every process as effective and functional as possible.
Transform
Move every unfinished project from planning to completion with excellence.
Dark grey Premier Underground pickup truck with the words Empower, Engage, Transform, Optimize on the bed
The strategy, on the side of a Premier pickup.

Phase 01 — Preconstruction

Precision estimates, delivered with integrity.

An accurate cost estimate drives every decision for the rest of the project. Our estimators bring more than 30 years of combined industry knowledge to yours.

  1. Engage

    Request for quote

    You send the drawings and the scope. The preconstruction team works to give you competitive pricing and the information you need to make an informed purchasing decision. The goal is to earn your business and your trust.

  2. Transform

    Completion of quote

    We price the work knowing the market we operate in. That means the real conditions of digging in Arizona, including hard dig and rock, spoils haul-off and surface restoration, so the number you carry is one a crew can build to.

  3. Empower · Optimize

    Project hand-off

    When you award the job, preconstruction completes a formal hand-off to operations. It is a critical milestone. Your requests, your schedule and your needs are written into the contract that the project manager receives, so nothing agreed during the bid is lost on the way to the field.

Phase 02 — Operations

Dependable people working through fifteen steps.

Operations is where your contract becomes trench, conduit and backfill. Our project managers and field superintendents work through the same sequence on every job.

  1. Before we mobilize

    Hand-off and buy-out

    Operations takes over the contract from preconstruction, along with your expectations and the cost plan that goes with them.

  2. Before we mobilize

    Material procurement

    Material is sourced at the most competitive prices we can find and lined up early, so a shortage does not interrupt the work.

  3. Before we mobilize

    Contract management

    Your project manager manages the contract continuously, covering resources, equipment, cost allocations and labor, with transparency.

  4. Before we mobilize

    Resource coordination

    Heavy equipment, small tools and materials are scheduled in resource management software, so the right resource is on the right task at the right time.

  5. While we build

    Project cost management

    Costs are tracked task by task. The field superintendent and project manager stay in close contact so billing, change orders and T&M data are accurate.

  6. While we build

    Job costing and reporting

    Reports compare the project goal, budget and forecast trend, so we can act before a financial problem becomes a delay.

  7. While we build

    Schedule adherence

    Schedule risks are looked for early. Our aim on every project is to finish ahead of the scheduled date with a quality product.

  8. While we build

    Equipment and vehicle care

    In-house mechanic crews keep the fleet working, so an equipment failure does not turn into a schedule delay.

  9. While we build

    Daily field documentation

    Field leadership completes the daily trench inspection, bore logs and JSAs in the company's digital system, which also gives visual progress updates.

  10. While we build

    Daily operations meeting

    Operations meets every day to plan the next one. Communication is a must at Premier.

  11. While we build

    Job site visits

    All Premier leaders are scheduled to visit sites, to support the field and keep culture, communication and project expectations in line.

  12. While we build

    Incidents and interventions

    Monthly safety meetings and a Risk Management department back an active safety program for every field employee and leader.

  13. As we finish

    Quality control

    Quality control processes and site visits check the work against company and client standards, with cross-training whenever the opportunity arises.

  14. As we finish

    Project close-out

    Close-out is done alongside the quality control team, to confirm the finished product meets your expectations.

  15. Throughout

    Communication

    Clear communication supports timely decisions and keeps your expectations and ours the same from the first day to the last.

The work itself is described on the services pages, from turnkey dry utility construction to duct bank and conduit.

Phase 03 — Quality

Checked while there is still time to adjust.

Every Premier project is visited by quality control. The point is to correct direction during the work, not to redo it afterward.

Our quality team works by the 20-60-20 rule: challenge, solution, coaching. A finding on site is not finished when it is fixed. It is finished when the crew has been coached so that a similar issue does not come back on the next job.

Premier Underground employees seated in a training session, company logo and values displayed on the wall
Coaching is the last part of the 20-60-20 rule.
01

Project site visits

Quality control visits are proactive. They confirm the work meets the Premier standard and the result you expect, and they keep an eye on budget and schedule while they are there.

02

Reporting

Each visit produces a quality control report. It documents what was discussed, records any deficiency and its correction, and feeds further training.

03

Close-out walk

The job ends with a final walkthrough between the operations team and the quality control team, to confirm the work meets your expectations and ours.

Phase 04 — Compliance and auditing

How we know the process is being followed.

A process only helps you if it is current and if someone checks it. That is the job of our compliance team.

As we ourselves transform, the key is to use that experience, courage and sensibility to empower others.

Vanessa English, Compliance Manager
  • 01

    Service standards

    Every department keeps updated standards and procedures. Compliance verifies and updates them so that company rules and expectations are clearly written down.

  • 02

    Process flows

    Each department's process is mapped as a visual flow. It shows what is expected at every step and where the process can be improved.

  • 03

    Internal audits

    Internal audits give independent assurance that our controls are working, and they identify changes that would improve service inside and outside the company.

Phase 05 — Finance

Billing you can check against the field.

Our finance team treats accounts receivable as part of customer service, from setting up a new client to the final payment. The working word is partnership.

01

Transparent invoicing

All project expenses are accounted for and provided to you. We would rather have an open, honest and upfront conversation about a number than a dispute about it later.

02

Change orders and T&M backed by field data

Change orders and time-and-material tickets are built from what the field superintendent and project manager record as the work happens, so the data behind them is accurate.

03

Certified payroll and labor-law compliance

Labor hours are tracked through digital software. Our payroll department keeps up to date on labor laws and regulations, including overtime pay and certified payroll, so a compliance problem does not affect your project.

04

Suppliers and subcontractors paid on agreed terms

Vendor and subcontractor invoices are verified, then paid according to the approved terms and payment schedule. That keeps payment disputes from interrupting your job.

Sharing a common vision and financial plan will not only bring us closer to achieving our joint goals but can maximize effectiveness.

Janeth Sosa, Controller
Silver Premier Underground Express rollback truck carrying a backhoe, with the blue Premier P sculpture at the Avondale yard behind it
A backhoe loaded on one of our rollback trucks at the Avondale yard.

Phase 06 — Logistics

The right machine, on your site, when the crew needs it.

Underground work depends on heavy equipment arriving in the right order. We move our own, with a logistics team of 8+ experienced CDL drivers.

Our logistics team plans each move and carries it out with precision, safety and reliability, from pickup at the yard to placement on your project. You do not have to arrange transport for the machines that dig your trench.

From pickup to placement, we manage the weight, so you don't have to.

Steve Garcia, Logistics Manager
  • Transform
  • Planning
  • Precision
  • Safety
  • Reliability

Your job. Your way.

Start with the drawings.

Send your plans, scope and schedule. Our preconstruction team prices the work and stays with it through the hand-off to operations.