Mission critical · Accelerated schedule
Iron Mountain Data Center
Sturgeon Electric / Holder Construction
- 2,500+Ft of hard dig, power
- 4,100Ft of hard dig, comms
- 244-inch conduit configuration
- 4,000+Cu yd ready-mix backfill
More than 2,500 feet of hard dig for medium- and low-voltage conduit, and 4,100 feet of hard dig for communications in a twenty-four-way bank of 4-inch conduit. The runs were backfilled with more than 4,000 cubic yards of ready-mix.